Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/08/2016 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by MRUSSO1 - |
| 08/03/2016 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) LOOKED AT PEDESTRIAN ACCESS TO THE BLDG AND SIDEWALK SLOPES ALONG ALL THREE ROADS
2) NEED RAILING ON TWO OF THE SIDEWALK RAMPS FROM THE EAST ACCESS AND SOUTH ACCESS.
3) ENSURE STORM WATER ALONG THE NORTH SIDE OF THE BLDG DRAINS PER APPROVED PLANS
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |