Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/01/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 09/01/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 09/01/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/12/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSPECTED GROUTING OF TOP AF WALL
2) CONTRACTOR SWEEPING ENTRANCE TO SITE
3) SEDIMENT CONTROLS HAVE BEEN RE-ESTABLISHED ALONG THE STREET
4) PROVIDE PROOF OF STORM WATER SELF INSPECTIONS FOR THE SITE |
| 08/10/2015 |
ENGR Grading Final |
MRUSSO1 |
Continued |
Entered by DROBERT5 - 1) RE0ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE
2) RE-ESTABLISH YOUR PERIMETER SEDIEMNT CONTROLS
3) INSTALL A CONCRETE WASH OUT PER YOUR SWPPP
4) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP
5) PER DEVELOPMENT STD 6-01.0, CLEAR WIDTH OF TRASH ENCLOSURE MUST BE MIN 10'X10'X5', YOUR PLANS SHOW 8.5' DEPTH ON TRASH ENCLOSURE.
6) ENSURE HC PARKING AND ACCESS MEET CODE. |
| 08/05/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) FOOTINGS FOR WALL PER PLAN
2) RE-BAR LAY OUT PER PLAN- PICTURES TAKEN
3) STORM WATER PERMIT/SITE IS IN NON-COMPLIANCE |