Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP14-0215
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/01/2015 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - |
08/12/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) INSPECTED GROUTING OF TOP AF WALL 2) CONTRACTOR SWEEPING ENTRANCE TO SITE 3) SEDIMENT CONTROLS HAVE BEEN RE-ESTABLISHED ALONG THE STREET 4) PROVIDE PROOF OF STORM WATER SELF INSPECTIONS FOR THE SITE |
08/10/2015 | SITE - Stormwater Follow-up | MRUSSO1 | Continued | Entered by DROBERT5 - 1) RE0ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE 2) RE-ESTABLISH YOUR PERIMETER SEDIEMNT CONTROLS 3) INSTALL A CONCRETE WASH OUT PER YOUR SWPPP 4) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP 5) PER DEVELOPMENT STD 6-01.0, CLEAR WIDTH OF TRASH ENCLOSURE MUST BE MIN 10'X10'X5', YOUR PLANS SHOW 8.5' DEPTH ON TRASH ENCLOSURE. 6) ENSURE HC PARKING AND ACCESS MEET CODE. |
08/05/2015 | SITE - Stormwater Follow-up | MRUSSO | Correction Required | Entered by DROBERT5 - 1) RE-ESTABLISH SEDIMENT CONTROLS AT THE PERIMETER NOT SURE IF THERE IS A STORM WATER PERMIT FOR THE SITE. 2) NO SUPERINTENDENT ON SITE 3) SWEEP UP TRACKED SOIL OF GRANDE 4) PROVIDE A CONCRETE WASH OUT 5) PROVIDE PROOF OF STORM WATER SELF INSPECTIONS 6) PROVIDE AN APPROVED PLAN ON SITE |