Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP14-0192
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2020 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 04/25/2016 | ENGR Engineering Final | DROBERTS | Continued | Entered by DROBERT5 - LOOKED OVER THE SITE, AS-BUILT DRAWINGS ARE NEEDED FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE PRIOR TO SCHEDULING THE FINAL INSPECTION, AS WELL AS A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD |
| 02/03/2016 | ENGR Engineering Final | RLEDONNE | Continued | Entered by RLEDONN1 - TOOK MORE PHOTOS. |
| 04/14/2015 | ENGR Engineering Final | ELeibold | Prior to Final Inspectn | Entered by JGREEN2 - Tech Man Sec.4-03.3.5.5.3, 4-03.3.5.1.3.a: Please be aware that ponding stormwater issues during final grading permit inspections can hold up CofO and final approvals. Infiltration rates shall meet Water Harvesting and Detention / Retention criteria per Tech Man Sec.4-03.III.3.5.1.3.a. For this project, please acknowledge that if standing water is found at the site, before final grading inspection, for more than 12 hours, final grading inspection approval will be denied and a re-submittal of the drainage report and plans with a re-engineered basin bottom will be required to be formally submitted for a Revision review.; and if standing water occurs after final grading inspection, submittal of a drainage report with plans showing a re-engineered basin bottom will be required to be formally submitted for review; and it is imperative that stormwater runoff disposal drain down time is achieved within 12 hours. |