Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP14-0189
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2016 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - |
| 01/06/2016 | SITE - Stormwater Follow-up | ROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
| 10/23/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT ON STREETS. |
| 09/18/2015 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
| 09/16/2015 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT6 THIS TIME. |
| 09/24/2015 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
| 09/17/2015 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS ON THE SITE AT THIS TIME, NO NOTABLE RAIN. |
| 09/11/2015 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THE SITE, MINOR TRACKOUT HAS BEEN NOTED AND WILL BE SWEPT BY THE END OF THE DAY |
| 08/28/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - CLEAN UP CONCRETE WAST OUT AREA. AND CONCRETE THAT WAS WASHS OUT AT NORTH SIDE OF SITE. |
| 08/21/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 08/07/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - CONTOLS TO BE REINSTALLED BY END OF DAY AT SOUTH WEST END OF SITE. |
| 07/31/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 07/24/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 07/17/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 07/10/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON CONCRETE CLEAN UP. NO OTHER CONCERNS AT THIS TIME. |
| 07/07/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 06/26/2015 | SITE - Stormwater Follow-up | RLEDONNE | Correction Required | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 06/19/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - |