Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/11/2016 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by MRUSSO1 - |
| 04/11/2016 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by MRUSSO1 - |
| 03/02/2016 |
ENGR Grading Final |
MRUSSO1 |
Continued |
Entered by MRUSSO1 - NO FINAL INSPECTIONS CALLED IN |
| 10/16/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - CONTRACTOR SPREADING AB FOR PAVING OF PARKING LOT |
| 10/07/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 09/21/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) LOOKED AT PVC ROOF DRAIN PIPE ALONG THE NORTH SIDE OF BLDG #3 - CONTRACTOR MADE CONNECTION TO THE MAIN LINE AND STUBBED THE PIPE - OK TO BURY
2) CALL FOR INSPECTION PRIOR TO POURING CONCRETE FOR THE HEAD WALL CONSTRUCTION
3) ENSURE TOE DOWNS FOR GROUTED RIP RAP MEET PLAN DETAILS
4) COMPLY WITH YOUR SWPPP UNTIL THE SITE IS STABILIZED
PICTURES TAKEN |
| 09/03/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR GROUTING MAHOLE CONNECTIONS TO STORM PIPE.- OK
2) LOOKED A EQUALIZER PIPE FOR RET/DET BASINS ALONG THE NORTH SIDE |
| 08/24/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) LOOKED AT COLLAR INSTALL FOR TRANSITION FROM SRP TO RCP - OK TO COVER
2) LOOKED AT MANHOLE PREP FOR RCP ALONG SOUTHWEST ENTRANCE AREA - OK TO POUR
3) LOOKED AT MANHOLE ALONG THE NE SIDE OF BLDG
PICTURES TAKEN |
| 08/21/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) LOOKED AT MANHOLE ALONG NE CORNER OF BLDG - TRANSITION FOR STORM PIPE PER COT STD DETAIL 300 AND 302. HAND FORMED WITH STEEL - OK TO POUR
2) LOOKED AT PVC LATERAL ALONG NW CORNER OF BLDG - INSTALLED PER PLAN - OK TO POUR
3) LOOKED AT RCP TO SRP TRANSITION W/STEEL COLLAR ALONG WEST ENTRANCE- OK TO POUR
PICTURES TAKEN |
| 08/14/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PVC STORM PIPE PARTIAL SECTIONS WERE INSTALLED PER THE APPROVED CIVIL PLAN - OK TO COVER
2) CONTRACTOR WORKING ON OVER-EXCAVATING FOR BRIDGE ACROSS WASH
3) CULVERT PIPES INSTALL AT OTHER CROSSINGS
4) ENSURE YOUR IN COMPLIANCE WITH YOUR SWPPP UNTIL THE SITE IS STABILIZED |
| 06/03/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ENSURE STORM WATER MAINT. SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP.
2) INSPECTION MUST BE KEPT ON SITE FOR VERIFICATION
3) CALL FOR INSPECTION PRIOR TO COVERING STORM PIPE - PER YOUR GRADING NOTES.
4) ENSURE ALL SITE/GRADING/LANDSCAPE CHANGES ARE APPROVED THROUGH THE CITY OF TUCSON AND ARE REFLECTED ON THE SITE DRAWINGS
5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 12/10/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |