Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 03/02/2016 |
SITE - Stormwater Follow-up
|
MRUSSO1 |
Approved |
Entered by MRUSSO1 - |
| 01/07/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 12/10/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 10/16/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - ENSURE SEDIMENT CONTTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION |
| 10/07/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 09/21/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 08/14/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PVC STORM PIPE PARTIAL SECTIONS WERE INSTALLED PER THE APPROVED CIVIL PLAN - OK TO COVER
2) CONTRACTOR WORKING ON OVER-EXCAVATING FOR BRIDGE ACROSS WASH
3) CULVERT PIPES INSTALL AT OTHER CROSSINGS
4) ENSURE YOUR IN COMPLIANCE WITH YOUR SWPPP UNTIL THE SITE IS STABILIZED |
| 06/03/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ENSURE STORM WATER MAINT. SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP.
2) INSPECTION MUST BE KEPT ON SITE FOR VERIFICATION
3) CALL FOR INSPECTION PRIOR TO COVERING STORM PIPE - PER YOUR GRADING NOTES.
4) ENSURE ALL SITE/GRADING/LANDSCAPE CHANGES ARE APPROVED THROUGH THE CITY OF TUCSON AND ARE REFLECTED ON THE SITE DRAWINGS
5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 05/11/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
3) SWEEP UP TRACKING OFF OF PUBLIC ROADWAYS |
| 04/30/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 04/14/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) STORM WATER SEDIMENT CONTROLS IN PLACE
2) ENSURE COMPLIANCE WITH YOUR STORM WATER PLAN AND PERMIT |
| 04/01/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 03/18/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by CSHARRA1 - NEED TO CONTACT PROJECT MANAGER - SITE NON-COMPLIANCE W/ STORM WATER PLAN AND PERMIT |