Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 04/11/2016 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Approved |
Entered by MRUSSO1 - |
| 03/03/2015 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Continued |
Entered by DROBERT5 - CORRECTION REQUIRED:
1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT ENTRANCE
3) INSTALL A STABIZED CONSTRUCTION ENTRANCE/EXIT
4) INSTALL A CONCRETE/MATERIALS WASH OUT
5) PROVIDE A MONITORING REPORT FROM THE LANDSCAPE ARCHITECT
CORRECT WITH IN 10 WORKING DAYS |
| 02/18/2015 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) MET WITH PROJECT MANAGER, REVIEWED PLANS AND WALKED SITE.
2) CONTRACTOR HAS STARTED IMPLEMENTING NPPO. PLANTS HAVE BEEN TAGGED AND IDENTIFIED.
3) A NUSERY WILL BE ESTABLISHED AND PLANTS WILL BE MOVED.
4) ENSURE YOUR STORM WATER PLAN IS IMPLEMENTED PRIOR TO GRUBBING AND GRADING.
5) CALL FOR RE-INSPECTION FOR QUESTIONS AND/OR CONCERNS |