Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/15/2015 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) NO STORM WATER PERMIT FOR SITE, HOWEVER AN APPROVED PLAN IS AVAILABLE. CONTRCTORS MUST KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION, FOR PROJECTS IN THE CITY LIMITS
2) ENSURE TRACKED SOIL IS SWEPT UP ROUTINELY.
3) CALL FOR INSPECTION FOR ANY CHANGES TO THE SITE/GRADING/LANDSCAPING PLANS |
| 10/14/2015 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - NO INSPECTION CALLED IN.
CALL IN FOR A PRE-CONSTRUCTION MEETING PER YOUR APPROVED PERMIT/PLANS.
MET SUPERINTENDENT ON SITE FROM LLOYD CONSTRUCTION |