Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Complete (Recurring)
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/20/2015 |
PDSD Engineering Division Pre-Construction SITE |
eleibol1 |
Continued |
Entered by ELEIBOL1 - Since there is a Revision #3 for the Lottaburger, make sure as-builts for Lottaburger are submitted. Also, note: special inspection and certification letter regarding requirement for engineered vapor barrier beneath slab will be needed at as-built submittal stage before final engineering inspection approval. |
| 09/02/2015 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |