Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP14-0138
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2016 | SITE - Stormwater Follow-up | RLEDONNE | Approved | Entered by RLEDONN1 - |
04/14/2016 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
08/20/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - |
08/13/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
08/10/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - |
07/27/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
07/14/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
06/26/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
06/18/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS WITH SWPPP CONTROLS AT THIS TIME. |
06/10/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - REINSTALLED STORM DRAIN PIPING ON WEST SIDE OF BUILDING. CLEAN BACK FILL OFF LOT TO WEST OF SITE. |
05/12/2015 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME, THE CREWS HAVE PLACED THE WATTLE AND CONCRETE WASHOUT FOR THE SITE. |
05/06/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH GC. |
04/22/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by CSHARRA1 - NO CONCERNS AT THIS TIME |
04/14/2015 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - MET WITH THE CONTRACTOR ON SITE AND DISCUSSED WHAT IS HAPPENING AT THIS TIME AND WHAT HE IS EXPECTING IN THE FUTURE. THEY ARE CURRENTLY ROUGH CUTTING THE LOT AND COMPLETE THE BUILDING PAD. HE IS HOPING TO START FINISHING THE PAD AND THEN START SETTING THE FORMS FOR HIS FUTURE CONCRETE POUR. HE HAS DECIDED TO MOVE THE CONCRETE WASHOUT SO THAT IT DOES NOT AFFECT HIS WORK SCHEDULOE. i ADVISED HIM TO NOTE THE CHANGES ON THE SWPPP PLAN AND DATE& SIGN WHEN THE CHANGES WERE MADE. |
04/08/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by ARUIZ1 - WALKED SITE WITH GC |