Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/31/2016 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/24/2016 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DROBERT5 - |
| 05/05/2016 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - PROVIDE AP PLANS FOR ALL CHANGES TO NORTH SIDE WALK PER DAVE ROBERTS. COMPLET ALL WORK OUT SIDE BUILDING . PROVIDE AS-BUILTS FOR GRADING AND DRAINAGE CHANGES. AND CERT LETTER FROM ENGINEER OF RECORD. |
| 04/27/2016 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 04/21/2016 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by DROBERT5 - SITEW NOT READY AT THIS TIME. THE CONTRACTOR IS PLANNING ON HAVING THIS SITE COMPLETED BY THE END OF APRIL. |
| 03/16/2016 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 03/04/2016 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO TRACK OUT . |
| 02/23/2016 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 02/04/2016 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - |
| 02/04/2016 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NEW JOB ON EAST SIDE OF SITE. |
| 09/02/2015 |
ENGR Engineering Final
|
RLEDONNE |
Denied |
Entered by RLEDONN1 - PROVIDE CERT LETTER FROM ENG OF RECORD AND AS-BUILTS. |