Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/20/2015 |
ENGR Grading Final |
RLEDONN1 |
Approved |
Entered by RLEDONN1 - REBAR FOR TRASH ENCLOSURE INSTALLED. |
| 05/21/2015 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 02/23/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - GOT WITH GC TO COMPLET AND INSTALL SWPPP SIGN. |
| 02/05/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - STILL WORKING ON SWPPP SIGN . |
| 01/16/2015 |
ENGR Grading Final |
RLEDONN1 |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT TRASH ENCLOSURE. LAY OUT. |
| 01/12/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 05/21/2015 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/04/2015 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - LOOKED OVER THE SITE I HAVE SOME CONCERNS WITH THIS SITE IN REGARDS TO THE LOCATION OF THE ROOF DRAINS AND THE ADJACENT CONCRETE SIDEWALKS. I HAVE ASKED THE CONTRACTOR TO HAVE THE EOR VERIFY THAT THE SITE WILL WORK AS SHOWN ON THE APPROVED PLANS. |
| 04/17/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by ARUIZ1 - WALKED SITE WITH G.C. CHECKED PAL'S (?) AND SIDEWALK SLOPES
|
| 04/13/2015 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - THE CREWS ARE WORKING ON PROCESSING THE FINAL DIRT GRADE OF THE PARKING LOT. WORK CONTINUES ON, AND AROUND THE BUILDING. |
| 04/03/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by ARUIZ1 - NO CONCERN AT THIS TIME |
| 06/11/2015 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |