Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 08/07/2015 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 11/18/2014 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS AROUND EXISTING CATCH BASINS.
2) MAINTAIN SEDIEMNT CONTROLS PER YOUR SWPPP.
3) CONTRACTOR IMPLEMENTED THE NPPO REQUIREMENT, NO CONCERNS AT THIS TIME
|