Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/09/2017 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 02/27/2017 |
ENGR Engineering Final
|
PB |
Approved |
Entered by PBAUGHM1 - Engineering certification provided by engineer of record. Steve Shields placed certification letter in with the package with ADA changes. |
| 02/13/2017 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PROVIDE A CITY APPROVED PLAN FOR FINAL INSPECTION
2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD - Engineering statement provided by engineer of record. |
| 08/14/2015 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - GRADING PERMIT NOT TO BE APPROVED UNTIL THE SITE/GRADING/LANDSCAPING ARE COMPLETED PER THE APPROVED PLANS:
|
| 08/07/2015 |
ENGR Engineering Final
|
MRUSSO |
Denied |
Entered by DROBERT5 - 1) NEW HC PARKING AND LOADING/UNLOADING SLOPE IS AT 4.3%.
SLOPE MUST BE 2% OR LESS IN ANY DIRECTION
2) ALL ROOF DOWN SPOUTS MUST BE ROUTED TO A SCUPPER. CONCENTRACTED FLOW CAN NOT DROP ON TO A SIDEWALK OR STAIRS.
3) COMPLETE ALL LANDSCAPING AROUND NEW BLDG PRIOR TO OCCUPANCY.
4) STABILIZE THE NEW RET/DET BASIN
5) INSTALL HANDRAILS WHERE APPLICABLE
6) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
CONSTRUCTION IS BEING PHASED |