Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP14-0086
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/09/2017 | ENGR Engineering Final | MRUSSO | Approved | Entered by DROBERT5 - |
02/27/2017 | ENGR Engineering Final | PB | Approved | Entered by PBAUGHM1 - Engineering certification provided by engineer of record. Steve Shields placed certification letter in with the package with ADA changes. |
02/13/2017 | ENGR Engineering Final | MRUSSO | Continued | Entered by DROBERT5 - 1) PROVIDE A CITY APPROVED PLAN FOR FINAL INSPECTION 2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD - Engineering statement provided by engineer of record. |
08/14/2015 | ENGR Engineering Final | MRUSSO | Continued | Entered by DROBERT5 - GRADING PERMIT NOT TO BE APPROVED UNTIL THE SITE/GRADING/LANDSCAPING ARE COMPLETED PER THE APPROVED PLANS: |
08/07/2015 | ENGR Engineering Final | MRUSSO | Denied | Entered by DROBERT5 - 1) NEW HC PARKING AND LOADING/UNLOADING SLOPE IS AT 4.3%. SLOPE MUST BE 2% OR LESS IN ANY DIRECTION 2) ALL ROOF DOWN SPOUTS MUST BE ROUTED TO A SCUPPER. CONCENTRACTED FLOW CAN NOT DROP ON TO A SIDEWALK OR STAIRS. 3) COMPLETE ALL LANDSCAPING AROUND NEW BLDG PRIOR TO OCCUPANCY. 4) STABILIZE THE NEW RET/DET BASIN 5) INSTALL HANDRAILS WHERE APPLICABLE 6) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD CONSTRUCTION IS BEING PHASED |