Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP14-0018
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/26/2017 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
05/20/2014 | ENGR Grading Final | jgreen | Continued | Entered by JGREEN2 - Per the submitted site plan and response letter it is shown that the current slopes on the existing sidewalks meet the maximum longitudinal and cross slope requirements; however during construction if the TDOT inspector finds nonconformance with the sidewalk for accessibility issues the contractor will be required to revise and provide new sidewalk. |
12/05/2016 | ENGR Grading Final | RLEDONN1 | Approved | Entered by RLEDONN1 - |
12/05/2016 | ENGR Grading Final | RLEDONN1 | Approved | Entered by RLEDONN1 - |
08/25/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER WORK THAT NEEDS TO BE DONE FOR FINAL. PROVIDE AS-BUILT FOR ALL CHANGES TO AP PLANS. |
05/24/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by DROBERT5 - INSTALLED TEMP ADA ACCESS. |
02/11/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT SIDEWALK FROM STREET ON WEST SIDE OF SITE. |
02/05/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSPECTION ON 6'' PVC FOR PLANTER ON NORTH SIDE OF BUILDING 80 ' FROM TIE IN. |
02/04/2016 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - |
12/29/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GC ADDED STRIPING FROM ADA PARKING TO STORE. |
12/29/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED NEW EMPLOYEE PARKING AREA ON NORTH EAST SIDE. COMPLET ALL WORK ON AP PLANS. PROVIDE ACCESSIBLE ROUTE FROM ALL ACCESSIBLE PARKING TO |
05/27/2015 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - WORKING ON STORM WATER DRAIN PIPING ON SOUTH SIDE OF BUILDING. |
12/05/2016 | ENGR Grading Final | RLEDONN1 | Approved | Entered by RLEDONN1 - |
12/18/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDE CROSS WALK FROM ACCESSIBLE PARKING |
10/19/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
10/06/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC NO CONCERN AT THIS TIME. |
07/21/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERS AT THIS TIME. |