Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/26/2017 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 05/20/2014 |
ENGR Grading Final |
jgreen |
Continued |
Entered by JGREEN2 - Per the submitted site plan and response letter it is shown that the current slopes on the existing sidewalks meet the maximum longitudinal and cross slope requirements; however during construction if the TDOT inspector finds nonconformance with the sidewalk for accessibility issues the contractor will be required to revise and provide new sidewalk. |
| 12/05/2016 |
ENGR Grading Final |
RLEDONN1 |
Approved |
Entered by RLEDONN1 - |
| 12/05/2016 |
ENGR Grading Final |
RLEDONN1 |
Approved |
Entered by RLEDONN1 - |
| 08/25/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER WORK THAT NEEDS TO BE DONE FOR FINAL. PROVIDE AS-BUILT FOR ALL CHANGES TO AP PLANS. |
| 05/24/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by DROBERT5 - INSTALLED TEMP ADA ACCESS. |
| 02/11/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT SIDEWALK FROM STREET ON WEST SIDE OF SITE. |
| 02/05/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - INSPECTION ON 6'' PVC FOR PLANTER ON NORTH SIDE OF BUILDING 80 ' FROM TIE IN. |
| 02/04/2016 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 12/29/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - GC ADDED STRIPING FROM ADA PARKING TO STORE. |
| 12/29/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED NEW EMPLOYEE PARKING AREA ON NORTH EAST SIDE. COMPLET ALL WORK ON AP PLANS. PROVIDE ACCESSIBLE ROUTE FROM ALL ACCESSIBLE PARKING TO |
| 05/27/2015 |
ENGR Grading Final |
RLEDONN1 |
Continued |
Entered by RLEDONN1 - WORKING ON STORM WATER DRAIN PIPING ON SOUTH SIDE OF BUILDING. |
| 12/05/2016 |
ENGR Grading Final |
RLEDONN1 |
Approved |
Entered by RLEDONN1 - |
| 12/18/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDE CROSS WALK FROM ACCESSIBLE PARKING |
| 10/19/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 10/06/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC NO CONCERN AT THIS TIME. |
| 07/21/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERS AT THIS TIME. |