Permit: DP14-0018

Parcel: 13323164A


Addresses:

7150 E SPEEDWAY BL

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
04/10/2017 ENGR Engineering Final DROBERTS Partial Approval Entered by DROBERT5 - STILL WAITING FOR THE REVISED DRAWINGS TO BE APPROVED BEFORE THIS PERMIT CAN BE APPROVED
04/26/2017 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
02/03/2017 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - NO CHANGES FROM LAST INSPECTION.
01/26/2017 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH DAVE ROBERTS LOOKING AT CHANGES FROM AP PLANS.
01/10/2017 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC ROOF DRAINS ON SOUTH WEST SIDE OF BUILDING STILL GOING OVER SIDE WALK. AS-BUILTS NOT AP BY COT YET AND STILL NO CERT LETTER FOR ALL GRADING AND GRAINAGE.
12/05/2016 ENGR Engineering Final RLEDONN1 Continued Entered by RLEDONN1 - COMPLET ALL WORK FROM PAST NOTES FROM 8-25-2016 AND 6-14-2016.
06/14/2016 ENGR Engineering Final RLEDONN1 Continued Entered by RLEDONN1 - WALKED SITE WITH GC ROOF DRAINS. DRAIN OVER SIDE WALKES ON SOUTH WEST SIDE OF SITE. PRVIDE CLEAR PATH ON NORTH SIDE OF STORE. NORTH EAST ADA RAMP OVER 8.33%. COMPLET ALL WORK ON AP PLANS. PROVIDE AS-BUILTS AND CERT LETTER FROM ENGINEER OF RECORD. LIST NOT COMPLET.