Permit: DP14-0013

Parcel: 117140930


Addresses:

383 S STONE AV


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP14-0013

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
03/13/2017 ENGR Engineering Final RLEDONNE Approved Entered by RLEDONN1 -
02/27/2017 ENGR Engineering Final DROBERTS Continued Entered by DROBERT5 - LOOED OVER THE AREA TO SEE WHAT WORK THEY WERE CALLING IN FOR APPROVAL. THE CONTRACTOR IS PLACING THE REBAR AND THE EXPANSION JOINT MATERIAL FOR THE POURING OF THE FLOOR AND THE ADJACENT SIDEWALK. THEY HAVE SCHEDULED THIS POUR FOR TOMORROW MORNING WEATHER PERMITTING, IT WILL BE POURED ON WEDNESDAY IF IT IS TO WET TOMORROW. THEY HAVE ADVISED ME THAT THE GATES MAY GET INSTALLED THE EARLY PART OF NEXT WEEK AND SHOULD BE CALLING IN FOR THE FINAL AT THAT TIME.
02/22/2017 ENGR Engineering Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE RESEEDING OF THE PROPERTY SOUTH OF THIS SITE, ALL APPEARS TO BE GOOD AT THIS TIME. THE REMAINING ITEM FOR THIS SITE IS THE TRASH ENCLOSURE CONSTRUCTION, POURING OF THE FLOORS, SIDEWALKS, AND INSTALLATION OF THE GATES FOR EACH ENCLOSURE.
01/11/2017 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - MET GC ON SITE ABOUT CURB ON NORTH EAST SIDE OF SITE.
01/05/2017 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - REBAR FOR WALL AND TRASH ENCLOUER OK.
12/28/2016 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT ADA RAMP ON WEST SIDE OF BUILDING.
12/28/2016 ENGR Engineering Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER WORK TO COMPLET FOR FINAL.