Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: DP13-0247

Parcel: 116300570

Inspection Status: Passed

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
01/27/2015 SITE - Stormwater Setup and Controls ELEIBOL1 Approved Entered by KROBLES1 - ASBUILT SUBMITTED PER DISCUSSION W/ INSPECTOR AND PHOTOS EL
02/13/2014 SITE - Stormwater Setup and Controls eleibol1 Prior to Intermediates Entered by ELEIBOL1 - Construction of north wall shall be from south side of wall only - no disturbance north of north wall. SWO may be inssued if non-compliant.
05/13/2014 SITE - Stormwater Setup and Controls RLEDONNE Approved Entered by RLEDONN1 -