Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/17/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) PRE-CON MEETING APPROVED
2) ENSURE BARREL CACTUS AND SAGAURO CACTUS ARE MOVED AND NOT DESTROYED DURING CONSTRUCTION
3) CALL FOR RE-INSPECTION AFTER SEDIMENT CONTROLS ARE INSTALLED FOR VERIFICATION
4) NEED TO INSPECT CULVERT PIPE INSTALL PRIOR TO COVERING
5) WILL RE-ASSESS DRAINAGE WHEN BLDG PAD IC CUT TO DETERMINE IF FLOW PATTERN SHOWN ON PLAN WILL WORK |