Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 06/02/2017 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 05/16/2017 |
PDSD Site/Engineering Division - Landscaping |
DROBERT5 |
Continued |
Entered by DROBERT5 - WAITING FOR THE REVISED DRAWINGS FOR THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. |
| 05/04/2017 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Continued |
Entered by DROBERT5 - AWAITING APPROVAL FOR LANDSCAPING CHANGES |
| 05/02/2017 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SITE LANDSCAPING DOES NOT MEET THE APPROVED LANDSCAPE PLAN.
2) PROVIDE AN APPROVED LANDSCAPE PLAN THAT SHOWS WHAT WAS PLANTED FOR THE FINAL INSPECTION. |