Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP13-0224

Parcel: 13316003C


Addresses:

6675 E GRANT RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP13-0224

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
03/17/2016 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
02/04/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR FOR MAT IN TRASH ENCLOSURE OK.
02/03/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR NI FOOTER OK.
03/17/2016 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
03/10/2016 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CREWS WORKING ON THE GENERAL CLEANUP OF THE SITE, PLACEMENT OF DG AS NEEDED IN ALL THE LANDSCAPE ISLANDS. THE CONTRACTOR IS PLANNING ON STRIPING THE PARKING LOT ON FRIDAY AFTER IT IS CLEANED THIS AFTERNOON
02/12/2016 ENGR Grading Final RLEDONNE Continued Entered by DROBERT5 - MET WITH GC ABOUT RAMP FROM GRANT ROAD.
02/10/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC WALKED SITE. SLOPES ON RAMPS ON WEST SIDE OVER 8.3% AND CROSS SLOPES OVER 2% AND RAMPS FROM PARKING AREA .
02/05/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC . WORKING ON SIDE WALK FROM STREET.
02/04/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON CURBS.
02/03/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON CURBS.
01/29/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - PER DAVE ROBERTS I GAVE PLAN FROM ENGINEER FOR TRASFER PIPING UNDER ACCESSIABLE PATH AND CURB CUTS.
01/28/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH DAVE ROBERTS AND GC DAVE CALLED ENGINEER ABOUT ADDING CURB CUTS TO CUERB AND GUTTER ON SOUTH SIDE OF BUILDING. I GOT WITH GC ABOUT CLEANING WASH OUT UP AND PROVIDING NEW WASH OUT AERA.
12/31/2015 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - OK TO GROUT TRASH ENCLOSURE.
12/29/2015 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 -
03/17/2016 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
03/17/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
03/22/2016 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -