Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/24/2014 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - GRADING IS APPROVED AT THIS TIME. I HAVE NOTED THAT THERE IS NO FILTER FABRIC UNDERNEATH THE ROCK RIP RAP MATERIAL, AND NO CONCRETE LINED AREASAT THE LOCATIONS WHERE ALL OF THE DRAINAGE FROM THE ROOF DRAINAGE IS CONCENTRATED TO. THE LACK OF THESE ITEMS CAN BE A MAINTENANCE ISSUE IN THE FUTURE AFTER THE LOCAL RAINS. IF THERE IS ANY MATERIAL WASHED AWAY DURING A STORM IT WILL NEED TO BE REMOVED FROM THE NUOS AREA AND PLACED BACK INTO THEORIGINAL LOCATION. |