Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/20/2015 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR PLAN. CALL FOR RE-INSPECTION WHEN COMPLETED.
2) INSTALL CONCRETE/MATERIALS WASH OUT EWHEN APPLICABLE
3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP.
4) MAINTAIN CONTROLS THROUGHOUT CONSTRUCTION
5) SWEEP UP TRACKING
6) CALL FOR ANY QUESTIONS/CONCERNS |
| 02/18/2015 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT ON SITE
2) CONTRACTOR NOT SURE IF HE IS REQUIRED TO HAVE A SWPPP OR NOT
3) APPROVED SITE/GRADING, AND LANDSCAPING PLANS ARE AVAILABLE, NO SWPPP IN DEVELOPMENT PACKAGE |