Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/22/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 10/30/2017 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/30/2017 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 06/05/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES, NO CONTACT ON SITE |
| 09/09/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - THE DEVELOPER HAS LEVELED A NEW AREA FOR ON SITE PARKING AND HAS PLACED WADDLES ALONG THE NORTH SIDE OF THE AREA TO PREVENT ANY MOVEMENT OF MATERIAL. I WILL ASK MIKE RUSSO TO CHECK OUT THIS SITE NEXT WEEK WHEN HE RETURNS. |
| 03/21/2016 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by MRUSSO1 - NO ACTIVITY, NO CONSTRUCTION, NO STORM WATER CONCERNS AT THIS TIME |
| 03/15/2016 |
ENGR Grading Final |
MRUSSO1 |
Continued |
Entered by MRUSSO1 - NO CHANGES / NO INSPECTION CALLED IN |
| 10/23/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) MET WITH ARCHITECT WALKED PROJECT.
2) ENSURE ANY CHANGES MADE ARE APPROVED AND SHOWN ON THE APPROVED PLANS FOR INSPECTION
3) CALL FOR INSPECTION FOR ANY UNDERGROUND WORK PRIOR TO COVER |
| 09/11/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO ACTIVITY, NO CHANGES AT THIS TIME |
| 08/28/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES, NO ACTIVITY THIS TIME |
| 06/19/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 03/16/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by ARUIZ1 - 1. NO CHANGES OR CONCERNS AT THIS TIME
2. ENSURE YOU PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECCORD PRIOR TO FINAL
GRADING APPROVED
3. PROVIDE AN APPROVED REVISED SITE/GRADING PLAN FOR FINAL |
| 04/03/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ENSURE ANY SITE/GRADING CHANGES MADE ARE SHOWN ON A REVISED PLAN.
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 03/09/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ANY CHANGES TO THE ORIGINAL APPROVED PLANS MUST BE APPROVED PRIOR TO FINAL
2) PROVIDE A CERTIFICATION FROM THE EOR
3) ANY UNDERGROUND WORK MUST BE INSPECTED PRIOR TO COVER |