Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP13-0146

Parcel: 99999999A


Addresses:

4050 E BENSON HY


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP13-0146

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
04/22/2020 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by DROBERT5 -
01/17/2020 PDSD Engineering Division Pre-Construction SITE DROBERTS Continued Entered by DROBERT5 - Vince I drove through the site and it appears that you have what looks like approximately 6 lots in the southern section that is unconstructed upon and 3 lots on the northern section not constructed upon. This appears to be enough to require the SWPPP to remain in place. Also you need to ensure that all of Inspection for the Development Package has been Approved. and make sure that all of the Assurance Inspection are completed for Tucson Water, Pima County Wastewater, City of Tucson Traffic and PIA are Approved. My Inspection will not be given till all of the other Inspections are Approved. Also make sure that the General Dirt and Landscaping Contractors have completed all of their work. Currently I am seeing no plants in one of the basins, minimal plants in other areas, missing tree stakes in different locations around the site. Also have the plans been revised to show that the property at the Northeast Corner of the site has been removed from the Common Area tabulations. If everything is completed then I will also need a copy of fully Revised Approved Drawings, a Certication Letter from the Engineer of Record, and the Notice of Termination Letter from ADEQ showing that this project is fully closed out. This will not be considered a full and final deficiency list due to the amount of work that still remains to be done at this time. Start working on Closing out all of the remaining Inspections on all of the Permits and Assurances and this should be able to be accomplished in the near future.
03/29/2018 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - 1) SITE HAS SWPPP, ENSURE COMPLIANCE WITH YOUR PLAN AND PERMIT. 2) NPPO HAS BEEN IMPLEMENTED, FINAL MONITORING MAY BE REQUIRED 3) PERIMETER SEDIEMNT CONTROLS ARE IN PLACE, SUPPLEMENTAL CONTROLS MAY NEED TO BE ADDED IN AREAS WITH THE LIKELYHOOD OF HIGHER STORM WATER FLOW 4) ENSURE STORM WATER MAINT INSPECTIONS ARE PERFORMED AND DOCUMENTED 5) FOLLOW UP AND PROGRESS INSPECTIONS WILL BE PERFORMED UNTIL THE SITE IS STABILIZED.