Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP13-0145

Parcel: 99999999A


Addresses:

4050 E BENSON HY

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
03/29/2018 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - 1) SITE HAS SWPPP, ENSURE COMPLIANCE WITH YOUR PLAN AND PERMIT. 2) NPPO HAS BEEN IMPLEMENTED, FINAL MONITORING MAY BE REQUIRED 3) PERIMETER SEDIEMNT CONTROLS ARE IN PLACE, SUPPLEMENTAL CONTROLS MAY NEED TO BE ADDED IN AREAS WITH THE LIKELYHOOD OF HIGHER STORM WATER FLOW 4) ENSURE STORM WATER MAINT INSPECTIONS ARE PERFORMED AND DOCUMENTED 5) FOLLOW UP AND PROGRESS INSPECTIONS WILL BE PERFORMED UNTIL THE SITE IS STABILIZED.