Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 09/26/2019 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/29/2018 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) SITE HAS SWPPP, ENSURE COMPLIANCE WITH YOUR PLAN AND PERMIT.
2) NPPO HAS BEEN IMPLEMENTED, FINAL MONITORING MAY BE REQUIRED
3) PERIMETER SEDIEMNT CONTROLS ARE IN PLACE, SUPPLEMENTAL CONTROLS MAY NEED TO BE ADDED IN AREAS WITH THE LIKELYHOOD OF HIGHER STORM WATER FLOW
4) ENSURE STORM WATER MAINT INSPECTIONS ARE PERFORMED AND DOCUMENTED
5) FOLLOW UP AND PROGRESS INSPECTIONS WILL BE PERFORMED UNTIL THE SITE IS STABILIZED. |