Permit: DP13-0074

Parcel: Unknown

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP13-0074

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
01/16/2014 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
01/14/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
12/30/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) SITE IS BEING PAVED 3) ENSURE TRACKED SOIL IS SWEPT UP AS NEEDED
12/27/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
12/06/2013 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by DROBERT5 - CONTRACTOR NEEDS TO INSTALL A STABILIZED CONSTRUCTION ENTRANCE
12/05/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/15/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO PRE-CON MEETING CALLED IN 1) SITE IS < AC NO SWPPP REQUIRED. HOWEVER, THE CONTRACTOR MUST KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION. 2) ANY CHANGES TO THE APPROVED SITE/GRADING PLAN MUST BE RE-APPROVED BY YOUR ENGINEER AND THE CITY OF TUCSON 3) SOIL FROM YOUR SITE CAN NOT BE USED OFF SITE. ANY SOIL DISTURBED OFF SITE DUE TO CONSTRUCTION MUST BE BROUGHT BACK ON SITE. 4) CALL FOR INSPECTION FOR ANY SITE PROBLEMS AND/OR CONCERNS.