Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/21/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL SEDIEMNT CONTROLS PER YOUR SWPPP. USE EXISTING BARRIERS IF POSSIBLE, CALL FOR APPROVAL
2) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE.
3) CALL FOR NPPO APPROVAL WHEN COMPLETED.
4) PROTECT EXISTING CATCH BASINS AND CULVERTS FROM CONSTRUCTION SOIL RUN-OFF
5) SWEEP UP TRACKED SOIL ROUTINELY.
6) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER PLAN
7) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE WHEN APPLICABLE.
8) PERFORM STORM WATER SELF INSPECTIONS PER PLAN AND DOCUMENT THEM
9) CALL FOR INSPECTION PRIOR TO COVERIN NEW STORM PIPE AND/OR CULVERTS |