Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP13-0072
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/30/2014 | ENGR Engineering Final | MRUSSO | Approved | Entered by DROBERT5 - |
05/28/2014 | ENGR Engineering Final | MRUSSO | Partial Approval | Entered by DROBERT5 - 1) ALL CONCRETE WORK, SITE WORK AND LOADING ZONES FOR BLDG'S 1, 2, AND 3 ARE SHOWN ON THE APPROVED PLANS. PROVIDE A STATEMENT FROM THE ENG OF RECORD STATING THAT WORK WILL BE DONE DURING FUTURE DEV. OR REVISE THE PLANS. 2) COMPLETE ALL DG AND ROCK RIP RAP WORK SHOWN ON PLANS 3) INSTALL TWO HC SIGNS FOR PARKING SPOTS IN FRONT OF CON'S - PLANS STATE 16 HC PARKING SPOTS PROVIDED, ONLY 14 HC SPOTS INSTALLED. 4) PROVIDE 11 BIKE PARKING SPACES FOR BLDG 4 - 8SHORT TERM AND 3 LONG TERM 5) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE SITE WAS COMPLETED PER THE APPROVED PLANS. |
05/01/2014 | ENGR Engineering Final | MRUSSO | Partial Approval | Entered by DROBERT5 - 1) THE MAJORITY OF THE SITE IS HARDSCAPED. MOST TEMP SEDIMENT CONTROLS HAVE BEEN REMOVED. 2) FILE A NOTICE OF TERMINATION WITH ADEQ PRIOR TO FINAL 3) PARKING LOT HAS BEEN PAVED, WILL START INSPECTING FOR FINAL ACCEPTANCE 4) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD AND AS-BUILT DRAWING PRIOR TO FINAL APPROVA |
01/21/2014 | ENGR Engineering Final | MRUSSO | Continued | Entered by DROBERT5 - 1) INSPECTION ON RE-BAR LAY OUT OF TWO BARREL BOX CULVERTS BEING CONSTRUCTED IN THE EXISTING DRAINAGE CHANNEL ALONG THE WEST PERIMETER. 2) CONTRACTOR CONSTRUCTING THE FLOOR OF THE CULVERT. RE-BAR WAS INSTALLED PER THE APPROVED PLAN AND ADOT DETAIL B-02.30 - OK TO POUR FLOORS FOR EACH. 3) RECEIVED A COPY OF THE ADOT DETAL USED FOR CONSTRUCTION AND NOT SHOWN ON THE APPROVED PLAQNS AND QUALITY CONTROL TESTING RESULTS FROM TERRACON. 4) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME. 5) ENSURE ALL CHANGES AND ADDITIONS TO THE APPROVED PLAN MUST BE REVISED AND APPROVED. |