Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/24/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - NOTE: ALL ASSOCIATED GRADING, LANDSCAPE, AND STORM WATER INSPECTION NOTES ARE DOCUMENTED UNDER PERMIT NUMBER DP13-0064. THIS DEVELOPMENT PAKAGE IS FOR PHASE I ONLY.
1) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED PLAN AND THE PRE-CON INSPECTION 3-10-14. CALL FOR RE-INSPECTION WHEN COMPLETE
2) INSTALL AND MAINTAIN YOUR STABILIZED CONSTRUCTION ENTRANCE AND/OR ENTRANCES THROUGHOUT CONSTRUCTION.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP
4) INSTALL A CONCRETE / MATERIALS WASH OUT WHEN APPLICABLE
5) PROTECT ALL EXISTING STORM DRAINAGE THROUGHOUT CONSTRUCTION
6) POST A COPY OF YOUR NOI ON SITE |