Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP13-0053
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/13/2015 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
10/13/2015 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
02/04/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH DAVID RIVERA AND DAVE ROBERTS. |
10/13/2015 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
02/21/2014 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - GOT WITH GC ABOUT PROVIDING REVISION FOR APPROVAL FROM PDSD BEFORE STARTING WORK ON CHANGES TO APPROVED PLANS. |
02/12/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON BUILDING PAD. |
02/10/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME. |
01/31/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON PADS. |
01/16/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - OVER XING ON SOUTH SIDE OF SITE. |
01/02/2014 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - MET RON ON SITE AND LOOKED OVER THE ISSUES AT HAND, I WILL TRY TO MEET WITH DAVID RIVERA OR PATRICIA GEHLEN AND DISCUSS WHAT THE ISSUES ARE AND HOW THEY MIGHT BE RESOLVED. CURRENTLY IT APPEARS THAT THE LANDSCAPE BUFFERS CANNOT BE MET IN SOME OF THE AREAS FOR THE 10 FEET AND 20 FEET AREAS ALONG THE SOUTH AND WEST AREAS. |
01/06/2014 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - MET WITH THE CONTRACTOR AND DAVID RIVERA ON SITE TO DISCUSS THE ISSUES AT HAND WITH THE LANDSCAPE BUFFER AREAS AND THE BUILDING WALLS. IT HAS BEEN DISCUSSED THAT THE EOR NEEDS TO VERIFY THAT THE LANDSCAPE BUFFERS CAN BE MET. IF THEY CANNOT BE MET HE WILL NEED TO SUBMIT PLANS SHOWING WHAT CHANGES NEED TO BE DONE TO THE SITE TOO ENSURE COMPLIANCE. |
01/03/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH GC AND DAVE. PULLED SOME MEASUREMENTS THAT ARE DIFFERENT FROM AP PLANS. DAVE IS CHFCKING WITH ZONING. |
12/23/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
12/09/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GRADING ACTIVITY ON NORTH SIDE OF SITE. |
12/05/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON GRADING ON SOUTH SIDE OF SITE. |
11/26/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
11/25/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITYON SITE. |
11/05/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
10/29/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
10/25/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - STARTING WORK ON PADS. NO CONCERNS AT THIS TIME. |
10/15/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PROVIDE RED LINES FOR ALL CHANGES TO AP SWPPP PLANS. |
10/10/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSTALL SWPPP CONTROLS BEFORE GRADING ACTIVITY. |
10/13/2015 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
04/21/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by ARUIZ1 - NO GRADING ACTIVITY AT THIS TIME |
02/10/2015 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - WORKING ON PADS. |
01/15/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON BASIN ON NORTH SIDE OF SITE. |
01/07/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING AROUND BASIN AT NORTH END OF SITE. |
12/12/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY. |
11/25/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON RIP-RAP IN BASIN ON NORTH SIDE OF SITE. |
11/18/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH DAVE AND GC ABOUT SIDE WALKS |
11/03/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY. |
10/29/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY. |
10/14/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME. |
10/07/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY. |
09/09/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE DO TO WEATHER. |
08/29/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY. |
08/07/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - SWPPP CONTROLS HAVE BEEN REPAIRED. |
04/11/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE. |
04/03/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC ABOUT DUST PER WARD-2 WATER TRCK ON SITE. |