Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/10/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - PRE-CON MEETING, ED W/ BARKER MORISEY (289-0328)
SITE IS < 1 AC NO SWPPP REQUIREMENT HOWEVER CONTRACTOR MUST KEEP SOIL ON SITE DURING CONSTRUCTION. CONTRACTOR INSTALLED SILT SOCK AT PERIMETER.
BLDG EXPANSION PROJECT. |