Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/14/2013 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/26/2013 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - AWAITING AS-BUILT DRAWING AND CERT STATEMENT FROM THE ENG OF RECORD |
| 08/21/2013 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) RECEIVED STATEMENT FROM ARCHITECT STATING THAT THE PEDESTRIAN PATH FROM THE ADJACENT PARKING LOT TO THE SOUTH IS NOT ADA COMPLIANT
2) NEED AS-BUILT
3) NEED CERT STATEMENT FROM THE EOR |
| 08/19/2013 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - NO CHANGES |
| 08/15/2013 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) COMPLETE PAVING
2) PROVIDE AN AS-BUILT DRAWING SHOWING ALL CHANGES MADE TO THE APPROVED GRADING/SITE PLAN.
TO INCLUDE BUT NOT LIMITED TO:
ADDED SCUPPER AND DRAINAGE FOR ROOF DRAINS
CHANGE IN ELEV AT TRASH ENLOSURES
NORTH SIDE PEDESTRIAN ACCES
WATER HARVESTING IN ISLANDS
LOCATION OF LIGHTING VS LANDSCAPING
PEDESTRIAN ACCESS FROM THE SOUTH LOT
3) COMPLETE STRIPING PER PLAN
4) COMPLETE LANDSCAPING PER PLAN
|