Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/30/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SITE IS < 1 ACRE THEREFORE NO SWPPP REQUIRED
2) CONTRACTOR DEMOLISHED AND IS RE-CONSTRUCTING A Mc DONALDS
3) MINIMAL SITE WORK, WILL INSPECT PER THE APPROVED SITE/GRADING, AND LANDSCAPE PLANS. |
| 05/15/2014 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Continued |
Entered by DROBERT5 - PRECON TO BE COMPLETED AT A LATER DATE BY MIKE RUSSO. CONTRACTOR WILL CONTINUE TO WORK AND WATCH HIS TRACKOUT ONTO SPEEDWAY. |
| 05/08/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION |
| 03/31/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION |
| 03/17/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION |
| 03/11/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION |