Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/19/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) IMPLEMENT YOUR STORM WATER PLAN PRIOR TO GRUBBING AND GRADING / AS SOON AS PRACTICABLE.
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/ EXIT PER YOR PLAN
3) ENSURE THE NPPO PLAN IS FOLLOWED - OK TO IMPLEMENT
4) ENSURE REGULATED WASH LIMITS AND SCENIC COORIDOR BOUNDRIES ARE ADHERRED TO.
5) CALL FOR RE-INPECTION WHEN STORM WATER CONTROLS ARE IN PLACE
6) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE |