Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP13-0010
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/29/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
09/29/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
09/29/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
02/12/2015 | ENGR Grading Final | MRUSSO | Prior to Final Inspectn | Entered by DROBERT5 - 1) NEED TO CONTACT BUILDER, GENERAL CONTRACTOR, AND ENG OF RECORD TO WALK SITE AND VERIFY SITE/GRADING. 2) PROVIDE AN AS-BUILT DRAWING AND CERT STATEMENT FROM THE ENG OF RECORD. 3) COMPLETE ALL SITE/GRADING PER APPROVED GRADING PLAN 4) COMPLETE ALL LANDSCAPING PER APPROVED PLAN. |
10/01/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION 2) PRIOR TO FINAL APPROVAL ENSURE ALL DISTURBED AREAS ARE STABILIZED 3) REPAIR EROSION DAMAGE AT SLOPES FOR BLDG PADS 4) PRIOR TO FINAL APRROVAL FOR GRADING PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD, COMPLETE SITE/GRADING, AND PROVIDE AN AS-BUILT DRAWING |
07/18/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE BOTTOM OF SLOPES. 2) STORM WATER CONTROLS MUST BE MAINTAINED THROUGHOUT CONSTRUCTION PER YOUR SWPPP. 3) CONTRACTOR POURED A STORM WATER MANHOLE AT PIPE JUNCTION ALONG THE NORTH/NORTHEAST SIDE OF SITE |
07/17/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR INSTALLING 18 AND 24" RCP ALONG NORTH SIDE OF SITE. 2) STORM PIPE WAS INSTALLED PER THE APPROVED GRADING PLAN. COMPACTION TESTING RESULTS ARE AVAILABLE. 3) THE ENGINEER OF RECORD WILL CERTIFY THE SITE/GRADING PRIOR TO FINAL APPROVAL. 4) RAINING AT THE TIME OF INSPECTION, CATCH BASINS AND MANHOLE WILL BE POURED AT A LATER TIME 5) SEDIMENT CONTROLS NEED MAINTAINED AND SELF INSPECTIONS MUST BE PERFORMED PER APPROVED SWPPP |
07/01/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO INSPECTIONS CALLED IN |
06/20/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT, DISCUSSED STORM WATER ISSUES AND INSPECTION REQUIREMENTS FOR GRADING. 2) THE SUPERINRENDENT STATED THAT THE SITE WILL COMPLY WITH THIER STORM WATER PERMIT. HE ALSO STATED THAT OLEARY WILL PLACE MOR "DO NOT ENTER" SIGNS ALONG THE NORTH WEST SIDE. |
06/18/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) INSTALL AND USE A DESIGNATED CONCRETE WASH OUT PER YOUR SWPPP 2) INSTALL SIGNS/BARRIERS ALONG THE WEST/NORTH WEST SIDE OF SITE IN ORDER TO DISCOURAGE TRESPASSING. 3) ANY CHANGES MADE TO SITE/GRADING MUST BE SHOWN ON THE APPROVED PLANS. 4) REPLACE WADDLE ALONG THE NW CORNER OF THE SITE. ANY ENTRANCES/EXITS MUST BE STABILIZED 5) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND SITE/DRAINAGE WORK. 6) PRIOR TO FINAL APPROVAL THE ENG OF RECORD MUST SUBMIT A CERTIFICATION STATEMENT, STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLANS |
06/17/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - ALL PUBLIC DRAINAGE WAYS HAVE BEEN INSPECTED BY COT TRANSPORTATION DEPT. ALL PRIVATE SITE/GRADING WILL BE INSPECTED BY PDSD. CONTRACTOR NEEDS TO CALL IN FOR INSPECTIONS PER THE APPROVED PLANS |
06/11/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SAFETY COMPLAINT FROM NEARBY RESIDENTS FOR OPEN TRENCHES ON THE ACTIVE CONSTRUCTION SITE BEING ACCESSIBLE. 2) SPOKE WITH SITE FORMAN FROM OLEARY CONSTRUCTION ABOUT OPEN TRENCHES ON SITE. CONTRACTOR IS WORKING ON INSTALLATION OF SEWER PIPE. 3) RECOMMENDED CONTRACTOR ADD MORE "DO NOT ENTER" SIGNS AROUND PROJECT IN ADDITION TO THE BIRMS THAT WERE BUILT AROUND THE TRENCHES. CONTRACTOR STATED THAT TRENCHING IN THE AREA SHOULD BE COMPLETED IN TWO WEEKS. 4) WILL CONTACT PROJECT MANAGER AND MAKE THEM AWARE OF SAFETY COMPLAINT. |
04/23/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) WALKED PERIMETER OF SITE, SEDIMENT CONTROLS IN PLACE. 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 3) INSTALL A CONCRETE/MATERIALS WASH OUT PER PLAN. 4) CONTRACTOR BUILDING GRADES FOR ROADWAYS AND BUILDING PADS |
04/02/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR ROUGH GRADING SITE |
03/31/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE TRACKING IS SWEPT ON A ROUTINE BASIS 2) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE 3) ENSURE CONTRACTOR STAYS WITH IN GRADING LIMIT DURING CONSTRUCTION |
10/17/2016 | ENGR Grading Final | MRUSS0 | Approved | Entered by MRUSSO1 - AS-BUILT AND CERT STATEMENT RECEIVED/ "NOT" SUBMITTED TO ADEQ |