Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/17/2016 |
ENGR Engineering Final
|
MRUSS0 |
Approved |
Entered by MRUSSO1 - AS-BUILT AND CERT STATEMENT RECEIVED/ "NOT" SUBMITTED TO ADEQ |
| 09/29/2016 |
ENGR Engineering Final
|
MRUSSO |
Correction Required |
Entered by MRUSSO1 - 1) PROVIDE AN APPROVED REVISED PLAN FOR FINAL INSPECTION.
2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD STATING THAT THE SITE GRADING WAS SUBSTANTIALLY COMPLETED PER THE APPROVED PLANS
3) PROVIDE A COPY OF YOUR NOTICE OF TERMINATION
4) PROVIDE COPIES OF YOUR STORM WATER SELF INSPECTIONS PERFORMED PER YOR SWPPP. |
| 02/12/2015 |
ENGR Engineering Final
|
MRUSSO |
Prior to Final Inspectn |
Entered by DROBERT5 - 1) NEED TO CONTACT BUILDER, GENERAL CONTRACTOR, AND ENG OF RECORD TO WALK SITE AND VERIFY SITE/GRADING.
2) PROVIDE AN AS-BUILT DRAWING AND CERT STATEMENT
FROM THE ENG OF RECORD.
3) COMPLETE ALL SITE/GRADING PER APPROVED GRADING PLAN
4) COMPLETE ALL LANDSCAPING PER APPROVED PLAN. |