Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP12-0220
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/24/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
10/24/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
10/24/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
10/24/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
10/15/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CHANGES FROM LAST INSPECTION. |
09/20/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH DAVE WENT OVER WORK THAT NEEDS TO BE DONE BEFORE FINAL. |
09/09/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
08/21/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PAVING WORK ON SOUTH SIDE OF YARD DONE. |
08/14/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GRADING ON SOUTH SIDE OF SITE. |
08/12/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MOVING EQUIPMENT FROM SOUTH SIDE OF YARD TO THE NORTH SIDE. |
08/05/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE TODAY ADDED BACKFILL IN BASIN AND PAVED BACK PARKING AREA. |
07/31/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - ROCK INSTALL IN BASIN. |
07/30/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - ROCK SIZE THAT CONTRACTOR IS INSTALLING IS NOT THE 4'' THAT WAS PER ENGINEER. |
07/24/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON BASIN ON NORTH WEST SIDE OF SITE. |
07/16/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GRADING WORK ON NORTH SIDE OF SITE. |
07/11/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
07/10/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON NORTH END OF BASIN. |
07/08/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - STILL WORKING ON NORTH SIDE GRADING. |
07/01/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GRADING WORK ON NORTH END OF SITE. |
06/21/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC FOR ROCK SIZE FOR DRAIN 4" PER ENGINEER OF RECORD. |
06/18/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PRE-CON PACKET COMPLET . SWPPP INFO INSTALLED. COPE OF NOI COMPLET. |