Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 08/15/2013 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 07/25/2013 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
| 07/19/2013 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - STOCK PILE SWPPP CONTROLS HAVE BEEN REPAIRED. |
| 07/18/2013 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - SWPPP CONROLS FOR STOCK PILE STILL NEEDS REPAIRS GOT WITH GC AND SWPPP CONTRACTOR. |
| 07/16/2013 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - STOCK PILE NEEDS SWPPP CONTROLS. |
| 07/15/2013 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NOTRACK OUT ON PARK AT THIS TIME. |
| 07/09/2013 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - GOT WITH GC TO ADD SWPPP CONTROLS AT TEMP STOCK PILE. |