Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2019 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 08/29/2013 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by RLEDONN1 - COMPLET AND HAVE APPROVED AS-BUILTS FOR FINAL. |
| 08/28/2013 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - GRADING CONTRACTOR FOR MARKETPLACE STABILIZATED AREA. |
| 08/26/2013 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS. TRASH ENCLOSURE NOT 10'X10' .SIGN FOR VAN ACCESSABLE NOT INSTALLED . COMPLET ALL WORK ON APPOVIDEPLANS. |
| 08/26/2013 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - PROVIDE STABILIZATION FOR ALL AREAS DISTURBED OUT SIDE CONSTRUCTION SITE BY YOUR CONTRACTORS. COMPLET ALL WORK ON APPROVIDE PLANS . AND PROVIDE AS-BUILTS. |
| 08/22/2013 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS. POVIDE CER LETTER FROM ENGINEER OF RECORD FOR ALL GRADING AND DRIANAGE. |