Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP12-0213
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by ARUIZ1 - |
11/13/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by ARUIZ1 - |
11/13/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by ARUIZ1 - |
10/31/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GC NOT ON SITE . TO GO OVER WORKFOR FINAL. |
10/28/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
10/10/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC ABOUT CERT LETTER FOR ALL GRADING AND DRAINAGE. |
10/09/2013 | ENGR Grading Final | eleibol1 | Continued | Entered by ELEIBOL1 - Report from Ken Perry at ES, who stated that his field trip found that trash enclosures were accepted for solid waste pick-up for Shops A2, B3, B4, & H. Ken reiterated that future projects will need 10 by10-ft clear inside bollards, a couple of feet of offset from front corner of trash enclosure where parking is to the side/front to avoid potential clipping of cars, no woven wire mesh should be accepted (gates need to be opaque, 40-ft approach should be straight & clear of curbs or other obstructions, enclosure area & approach area shall not be in a stormwater flow line and have minimum 2% grade for postive gradient for flows to flow away from enclosure. |
09/09/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH DAVE GOT WITH CONTRACTOR ABOUT INSTALLING BIKE PARKING . AND PROVIDE LETTER TASH ENCLOSURE. |
09/05/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CHANGE TO TRASH ENCLOSURE. |
08/28/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GRADING CONTRACTOR STABILIZATED DISTURBED AREA. |
08/27/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FINAL GRADING FOR STABILZATION ON AREA OFF SITE. |
08/06/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVTY OUT BUILDINGS. |
08/01/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
07/16/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC ABOUT PALS IN PARKING AREA AT PAD H. |
07/02/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FINAL GRADING WORK AROUND BUILDING. ON PAD A-2. |
07/01/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - STRADED PAVING WORK ON PAD A-3. |
06/10/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - ALL CATCH BASINS COMPLET. |
06/07/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PAD H TRASH ENCLOURES 10 BY 10 . |
06/06/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON CURBS . AND BACK FILLING. |
05/29/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PAD B-3 WORKING ON STORM PIPING AND BASINS . |
05/28/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FORMING CATCH BASIN ON WEST SIDE OF SITE. AT PAD B-3. |
05/23/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - BOTTOM OF CATCH BASIN ONLY. |
05/22/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON PAGE G-4. |
05/20/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PAD B-3 PER HIGH LIGHT ON PAGE G4FOR STROM DRAIN PIPING. |
05/15/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - CURB WORK ON PAD H. NO TRACK OUT AT THIS TIME. |
04/30/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - ADD CONTROLS AT CATCH BASINS . FOR A-2 PAD AND H PAD. |
04/23/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PADS H& A-2 WORKING ON WATER MAINS ONLY AT THIS TIME. |
04/08/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON PAD A-2 OR PAD H. |
04/05/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC ABOUT SWPPP INFO FOR PAD H .AND PROVIDE SWPPP CONTROLS AT NEW BASINS FOR PADS H & A-2. |
04/01/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON CATCH BASIN ON NORTH EAST SIDE OF PAD H. WORKING ON STROMDRAIN MANHOLE AT PAD A-2. |
03/29/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSPECTOIN FOR PAD A-2 PAGE G-3 PER HIGH LIGHT. BASIN INPECTION FOR PAD H PER HIGH LIGHT ON PAGE G-5. |
03/28/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - THIS INSPECTION IS FOR SITE H INSPECTION PER HIGH LIGHT ON PAGE C-5. |
03/13/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON SITE SEWER. NO TRACK OUT OR GRADING ACTIVITY. |