Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP12-0213
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2013 | SITE - Stormwater Follow-up | RLEDONNE | Approved | Entered by ARUIZ1 - |
| 07/25/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC ABOUT SWPPP CONTROLS. |
| 07/18/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT RO GRADING ACTIVITY AT THIS TIME. |
| 07/09/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC TO ADD SWPPP CONTOLS AT TEMP STOCK PILE. |
| 05/08/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - STILL WORKING ON SWPPP CONTROLS. |
| 05/06/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - LAYING OUT FOR SWPPP CONTROLS AROUND PADS ON SIUTH SIDE OF STREET FROM A-2 PADS. |
| 05/02/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - CONTROLS HAVE BEEN INSTALLED AT BASINS. PAD2A AND H. |
| 04/25/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 04/03/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GRADING CONTRACTOR TO INSTALL SWPPP INFO AT PAD H AND WASH OUT AT A-2 AND H PADS. |
| 03/29/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - |
| 03/25/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - INSPECTION PER HIGH LIGHT ON G-3. |
| 03/20/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - CONTROLS LOOK OK NO TRACK OUT. |
| 03/15/2013 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH GRADING CONTRACTOR. NEEDS TO MOVE CONTROLS ON WEST SIDE OF SITE. |