Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/24/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) PRIOR TO THE START OF CONSTRUCTION, INSTALL SEDIMENT CONTROLS PER YOUR APPROVED SWPPP AND ADEQ PERMIT.
2) POSTA A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
3) ENSURE YOU PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP
4) INSTALL A CONCRETE/ MATERIALS WASH OUT
5) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
6) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND STORM WATER/UTILITIES WORK
7) SWEEP UP ANY TRACKED SOIL OFF ADJACENT ROADWAYS |