Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP12-0212
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/24/2013 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) PRIOR TO THE START OF CONSTRUCTION, INSTALL SEDIMENT CONTROLS PER YOUR APPROVED SWPPP AND ADEQ PERMIT. 2) POSTA A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE 3) ENSURE YOU PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP 4) INSTALL A CONCRETE/ MATERIALS WASH OUT 5) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 6) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND STORM WATER/UTILITIES WORK 7) SWEEP UP ANY TRACKED SOIL OFF ADJACENT ROADWAYS |