Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP12-0212
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/04/2014 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
01/30/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SITE HAS BEEN PAVED AND CONTRACTOR WORKING ON FINISHING WORK SUCH AS STRIPING, MANHOLE RINGS, CLEAN UP ETC. 2) PAVING OF THE PARKING AREA AND SURROUNDING WAS DONE POORLY. LOTS OF ELEVATION MISSES, RIMS OF MANHOLES ABOVE GRADE, VARIATIONS OF GRADE AND SLOPPY TRANSITON POINTS. OWNER AND GENERAL CONTRACTOR MAY NOT ACCEPT WORK. 3) ENSURE A NOTICE OF TERMINATION IS FILED WITH ADEQ 4) ENSURE REMAINING CONSTRUCTION IS COMPLETED PER THE APPROVED PLANS. 5) ENSURE APPROVED PLANS MATCH WHAT WAS CONSTRUCTED ON SITE. 6) PROVIDE A CERTIFICATION STATEMENT FROM AN ENGINEER STATING THAT THE SITE/GRADING WAS COMPLETED PER THE APPROVED PLANS. |
12/03/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR WORKING ON STORM DRAIN TIE-IN AT SOUTH WEST CORNER. 2) CONTRACTOR WORKING ON PARKING AREA CURBING. 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
11/26/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS |
10/30/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO INSPECTIONS CALLED IN. 2) CONTRACTOR WORKING ON PARKING LOT ISLANDS AND CURBING 3) NO APPROVAL ON CHANGES TO STORM WATER PIPE |
09/23/2013 | ENGR Grading Final | MRUSSO | Correction Required | Entered by DROBERT5 - 1) PROVIDE APPROVAL FROM YOUR ENG OF RECORD FOR CHANGES MADE TO THE STORM WATER DRAINAGE SYSTEM (OMITTING A SECTION OF PIPE) NE CORNER OF BLDG. 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) PROVIDE CLARIFICATION ON HDPE STORM PIPE CONNECTION/TIE-IN TO EXISTING SRP. 4) ENSURE STORM WATER CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION. |
08/28/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) STORM PIPE ALONG NORTH SIDE OF SITE HAS BEEN INSTALLED PER PLAN ( PICTURES TAKEN) . CATCH BASINS AND TRANSITIONS HAVE BEEN LEFT OPEN FOR INSTALLATION. 2) THE STORM PIPE ALONG THE WEST SIDE OF SITE IS BEING INSTALLED - WILL CONT TO INSPECT 3) UTILLITY INSTALL TAKING PLACE, NO OTHER SITE WORK AT THIS TIME |
08/26/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR INSTALLING 24" HDPE STORM PIPE ACROSS NORTH SIDE OF BLDG IN FUTURE PARKING AREA FROM CATCH BASIN TO CATCH BASIN. TRENCH COMPACTED, PIPE BACKFILLED PICTURE TOOK. |
08/22/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR DIGGING TRENCH FOR 24" HDPE STORM DRAIN LINE - AWAITING APPROVAL OF BEDDING MATERIAL. WILL RE-INSPECT PRIOR TO COVER |
08/21/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR INSTALLING STORM PIPE, WILL TAKE PICS AND DOCUMENT INSTALLATION |
08/20/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR WORKING ON THE BLDG AND UTILITY TIE-IN 2) NO SIGNIFICANT SITE WORK AT THIS TIME 3) STORM PIPE HAS BEEN DELIVERED AND STOCKPILED ON SITE |
08/07/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR WILL START INSTALLING STORM DRAIN LINE THIS WEEK. 2) CONTRACTOR WORKING ON BLDG PAD AND LOADING DOCKS 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
07/10/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SEDIMENT CONTROLS IN PLACE , HOWEVER EROSION DAMAGE WAS DONE ON FRIDAY JULY 5TH FROM A RAINSTORM. 2) SEDIMENT CONTROL DAMAGED HAS BEEN REPAIRED, BUT ADJACENT SLOPES INTO EXISTING DRAINAGE CHANNEL NEEDS TO HAVE SOIL REPLACED AND COMPACTED. 3) SWEEP UP TRACKED SOIL ON A ROUTINE BASIS 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR STORM WATER PLAN. 5) NO SIGNIFICANT SITE WORK AT THIS TIME, CONTRACTOR IS WORKING SOIL FOR BLDG PAD |
03/19/2014 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
02/04/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NEED A REVISED PLAN SHOWING CHANGES MADE TO THE STORM DRAINAGE SYSTEM |