Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP12-0212

Parcel: 99999999A


Addresses:

9044 S HOUGHTON RD


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP12-0212

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
01/30/2014 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 - 1) SITE HAS BEEN PAVED AND CONTRACTOR WORKING ON FINISHING WORK SUCH AS STRIPING, MANHOLE RINGS, CLEAN UP ETC. 2) PAVING OF THE PARKING AREA AND SURROUNDING WAS DONE POORLY. LOTS OF ELEVATION MISSES, RIMS OF MANHOLES ABOVE GRADE, VARIATIONS OF GRADE AND SLOPPY TRANSITON POINTS. OWNER AND GENERAL CONTRACTOR MAY NOT ACCEPT WORK. 3) ENSURE A NOTICE OF TERMINATION IS FILED WITH ADEQ 4) ENSURE REMAINING CONSTRUCTION IS COMPLETED PER THE APPROVED PLANS. 5) ENSURE APPROVED PLANS MATCH WHAT WAS CONSTRUCTED ON SITE. 6) PROVIDE A CERTIFICATION STATEMENT FROM AN ENGINEER STATING THAT THE SITE/GRADING WAS COMPLETED PER THE APPROVED PLANS.
12/24/2013 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by DROBERT5 - SWEEP UP TRACKED SOIL FROM ADJACENT ROADWAYS ENSURE STORM WATER CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION
12/03/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR WORKING ON STORM DRAIN TIE-IN AT SOUTH WEST CORNER. 2) CONTRACTOR WORKING ON PARKING AREA CURBING. 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/26/2013 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by DROBERT5 - 1) NON-COMPLIANCE WITH YOUR SWPPP 2) SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAY. SOIL HAS BEEN TRACKED FROM THE ENTRANCE/EXIT TO THE SITE ALL THE WAY OUT AND ON TO OLD VAIL ROAD. 3) CLEAN UP TRACKED SOIL, RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE, CALL FOR RE-INSPECTION
10/30/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) SOME TRACKING OF SOIL OFF SITE FROM TRUCK TRAFFIC. SWEEP UP TRACKING MORE OFTEN. RE-ESTABLISH CONSTRUCTION ENTRANCE AS NEEDED. 2) NO OTHER STORM WATER CONCERNS AT THIS TIME.
09/23/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) PROVIDE APPROVAL FROM YOUR ENG OF RECORD FOR CHANGES MADE TO THE STORM WATER DRAINAGE SYSTEM (OMITTING A SECTION OF PIPE) NE CORNER OF BLDG. 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) PROVIDE CLARIFICATION ON HDPE STORM PIPE CONNECTION/TIE-IN TO EXISTING SRP. 4) ENSURE STORM WATER CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION.
08/28/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - SOME RAIN DURING THE WEEK END. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
08/26/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO STORM WATER CONCE3RNS AT THIS TIME
08/22/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
08/21/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO STORM WATER CONCE3RNS AT THIS TIME
08/20/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
08/07/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR WILL START INSTALLING STORM DRAIN LINE THIS WEEK. 2) CONTRACTOR WORKING ON BLDG PAD AND LOADING DOCKS 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
07/11/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) DAMAGE FROM RAIN STORM HAS BEEN REPAIRED 2) ENTRANCE/EXIT TO SITE HAS BEEN SWEPT 3) CONTRACTOR WORKING SOIL FOR BLDG PAD, MAY NEED AMENDMENT ADDED IN ORDER TO MEET COMPACTION 4) HOUGHTON TOWN CENTER PERMIT # T11BU01704 HAS NOT BEEN APPROVED
07/10/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) SEDIMENT CONTROLS IN PLACE , HOWEVER EROSION DAMAGE WAS DONE ON FRIDAY JULY 5TH FROM A RAINSTORM. 2) SEDIMENT CONTROL DAMAGED HAS BEEN REPAIRED, BUT ADJACENT SLOPES INTO EXISTING DRAINAGE CHANNEL NEEDS TO HAVE SOIL REPLACED AND COMPACTED. 3) SWEEP UP TRACKED SOIL ON A ROUTINE BASIS 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR STORM WATER PLAN. 5) NO SIGNIFICANT SITE WORK AT THIS TIME, CONTRACTOR IS WORKING SOIL FOR BLDG PAD