Permit: DP12-0212

Parcel: 99999999A


Addresses:

9044 S HOUGHTON RD


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP12-0212

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
03/19/2014 ENGR Engineering Final MRUSSO Approved Entered by DROBERT5 -
01/30/2014 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - 1) SITE HAS BEEN PAVED AND CONTRACTOR WORKING ON FINISHING WORK SUCH AS STRIPING, MANHOLE RINGS, CLEAN UP ETC. 2) PAVING OF THE PARKING AREA AND SURROUNDING WAS DONE POORLY. LOTS OF ELEVATION MISSES, RIMS OF MANHOLES ABOVE GRADE, VARIATIONS OF GRADE AND SLOPPY TRANSITON POINTS. OWNER AND GENERAL CONTRACTOR MAY NOT ACCEPT WORK. 3) ENSURE A NOTICE OF TERMINATION IS FILED WITH ADEQ 4) ENSURE REMAINING CONSTRUCTION IS COMPLETED PER THE APPROVED PLANS. 5) ENSURE APPROVED PLANS MATCH WHAT WAS CONSTRUCTED ON SITE. 6) PROVIDE A CERTIFICATION STATEMENT FROM AN ENGINEER STATING THAT THE SITE/GRADING WAS COMPLETED PER THE APPROVED PLANS.
09/23/2013 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - 1) PROVIDE APPROVAL FROM YOUR ENG OF RECORD FOR CHANGES MADE TO THE STORM WATER DRAINAGE SYSTEM (OMITTING A SECTION OF PIPE) NE CORNER OF BLDG. 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) PROVIDE CLARIFICATION ON HDPE STORM PIPE CONNECTION/TIE-IN TO EXISTING SRP. 4) ENSURE STORM WATER CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION.