Permit: DP12-0203

Parcel: 11806082D


Addresses:

2013 W SAN JUAN TR

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
11/05/2015 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 - MET ON SITE WITH CHRIS VEIL, HE HAS COMPLETED THE AREAS ON SITE THAT WERE UNSAFE(BENT THE REBAR OVER) AND PERFORMED GENERAL CLEANUP. SITE PLANS HAVE BEEN REVISED AND APPROVE BY ELIZABETH LEIBOLD IN THE CURRENT CONDITION OF THE SITE IS AT THIS TIME. SEE THE DETAIL SHEETS ON THE APPROVED PLANS IN SIRE FOR ADDITIONAL INFORMATION. THE SITE APPEARS TO BE IN A SAFE MANNER AT THIS TIME SO I AM APPROVING THIS SITE ONLY FOR THIS DEVELOPMENT PACKAGE AS DIRECTED BY THE EMAIL THAT IS NOTED BELOW. Jim Vogelsberg 09/10/2015 1:21 PM E', Yes, let's close out the Engineering portion for this site; however, any open CM issues must be dealt with prior to the permit is finaled. Thanks