Permit: DP12-0200

Parcel: 12510003F


Addresses:

3601 E BROADWAY BL


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP12-0200

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
08/19/2013 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
08/07/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
07/24/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CONCERNS OR CHANGES. THERE IS AN ADDITIONAL DEV. PERMIT FOR THIS SITE DP13-005
07/11/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - INSPECTION CALLED IN FOR A PROGRESS DISCUSSION, SITE 1) NOT READY FOR FINAL.INSPECTION CALLED IN FOR PARKING AREA IN FRONT OF THE CLAIM JUMPER . PARKING AREA HAS BEEN COMPLETED. 2) NO STORM WATER CONCERNS AT THIS TIME
06/11/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
06/04/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) MINIMAL SITE WORK, NO CONCERNS AT THIS TIME
05/14/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED AROUND PARKING AREA NEXT TO THE CLAIM JUMPER RESTAURANT PER PREVIOUS INSPECTION 2) CONTRACTOR WILL SWEEP UP TRACKED SOIL AS NEEDED 3) ANY CONCRETE/MATERIALS WASH OUT SHOULD BE WASHED INTO A DESIGNATED AREA AS NEEDED 4) CONTACT THE COT FOR ANY CHANGES AND/OR CONCERNS WITH THE SITE WORK
05/10/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR INSTALLING A NEW PARKING LOT ALONG THE CLAIM JUMPER RESTAURANT - WORK IS SHOWN ON THE PETS MART. 2) STORM WATER CONTROLS WILL BE INSTALLED IN AREAS WHERE STORM WATER WILL FLOW OFF SITE. 3) CALL FOR RE-INSPECTION WHEN CONTROLS ARE INSTALLED
05/03/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
04/19/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO STORM WATER CONCERNS AT THIS TIME 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 3) CONTRACTOR WORKING ON BLDG PAD
04/10/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
04/04/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - ALL SEDIMENT CONTROLS HAVE BEEN INSTALLED. NO STORM WATER CONCERNS AT THIS TIME