Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 08/19/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/07/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 07/24/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT CONCERNS OR CHANGES.
THERE IS AN ADDITIONAL DEV. PERMIT FOR THIS SITE DP13-005 |
| 07/11/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - INSPECTION CALLED IN FOR A PROGRESS DISCUSSION, SITE 1) NOT READY FOR FINAL.INSPECTION CALLED IN FOR
PARKING AREA IN FRONT OF THE CLAIM JUMPER . PARKING AREA HAS BEEN COMPLETED.
2) NO STORM WATER CONCERNS AT THIS TIME |
| 06/11/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 06/04/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) MINIMAL SITE WORK, NO CONCERNS AT THIS TIME |
| 05/14/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED AROUND PARKING AREA NEXT TO THE CLAIM JUMPER RESTAURANT PER PREVIOUS INSPECTION
2) CONTRACTOR WILL SWEEP UP TRACKED SOIL AS NEEDED
3) ANY CONCRETE/MATERIALS WASH OUT SHOULD BE WASHED INTO A DESIGNATED AREA AS NEEDED
4) CONTACT THE COT FOR ANY CHANGES AND/OR CONCERNS WITH THE SITE WORK |
| 05/10/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR INSTALLING A NEW PARKING LOT ALONG THE CLAIM JUMPER RESTAURANT - WORK IS SHOWN ON THE PETS MART.
2) STORM WATER CONTROLS WILL BE INSTALLED IN AREAS WHERE STORM WATER WILL FLOW OFF SITE.
3) CALL FOR RE-INSPECTION WHEN CONTROLS ARE INSTALLED |
| 05/03/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 04/19/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO STORM WATER CONCERNS AT THIS TIME
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP
3) CONTRACTOR WORKING ON BLDG PAD |
| 04/10/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 04/04/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - ALL SEDIMENT CONTROLS HAVE BEEN INSTALLED.
NO STORM WATER CONCERNS AT THIS TIME |